Availability and quantity
- Fabric MOQ or minimum mill quantity
- Minimum quantity per custom color
- Whether the fabric is available from stock
- Sample-yardage availability
- Suitable substitute-fabric options for development
MATERIAL PLANNING
Minimums should be checked early when a project requires custom dyeing, special finishes, exclusive colors, or non-stock fabrics. A workable sample material is not always commercially practical for the intended bulk quantity.
A development sample may use available stock fabric, while the approved bulk color requires a separate dye lot with its own minimum quantity. Small sample quantities do not automatically mean the same material can later be produced economically at a small bulk quantity.
At Call The STYLE, fabric and color minimums can be reviewed during sample development so the selected material is compatible with the planned order quantity, target cost, and production timeline.
Any stock option, surcharge, substitute, or custom-material requirement should be documented before final material approval.
Discuss your fabric and color plan